公告内容:
请按招标公告要求提交资格审查外,还需提供我司用户要求新增的资格审查资料(请按照如下要求提供中英文对照版资料)
ZPMC is required to proceed with preselection and prequalification based on an approval package that includes at least the documents listed below:
Company Profile, including years of experience and organizational structure
List of fabrication equipment and machinery
List of key personnel with CVs (fabrication, welding, QA/QC)
ISO Certifications
Welding Certifications: WPS, PQR, WQR
QA/QC Manual and procedures
Standard Inspection Test Plan (ITP)
Details of NDT capabilities and methods
Material traceability procedures
List of similar completed projects and client references
Production capacity (annual tonnage)
Photos videos of the shop.
ZPMC must submit the approval packages of the selected/prequalified manufacturers and Prequalification in accordance with the requirements of the contractual scope.
Following the validation of the approval package, a decision will be made regarding the need for a Site/Factory visit.